Availability Verification of Inter State Transmission System of Eastern Region for the month of August 2019

Availability Verification of Inter State Transmission System of Eastern Region for the month of August 2019

Availability Verification of Inter State Transmission System of Eastern Region for the month of August 2019.

Comments invited before 16th September, 2019.

 
Disclaimer: The values shown in the reports are based on operational data and may not be used for commercial computation

ABOUT US

Eastern Regional Load Despatch Centre (A Government of India Enterprise) CIN: U40105DL2009GOI188682

Eastern Regional Load Despatch Centre (ERLDC) is the apex body to ensure integrated operation of the power system in the Eastern Region.  © 2016 - 2017 All Rights Reserved

This site is best viewed in
Site Viewer143,816

CONTACT US

   Eastern Regional Load Despatch Centre, 14, Golf Club Road, Tollygunge, Kolkata -700 033

(+91) 33 30116900-09 (EPABX) 2423-5875 / 24235265 / 30116990-96 (CONTROL ROOM)

erldcinfo@posoco.in

(+91) 33 2423-5809